CMDA Buildings Locked & Sealed
Buildings locked and sealed by CMDA for violations in Chennai Metropolitan Development Area
Search Locked & Sealed Buildings
Locked & Sealed Buildings (255 Results)
ED/NI/4968/15
Door No.47, Subramania Mudali Street, Seven Wells, Chennai-600 001
Residential building
ES1/20075/2004
Door No.74, C.P.Ramasamy Road, Alwarpet, Chennai-600 018 at T.S.No.3688/2 & 15,...
Residential Building
ES3/16817/2014
Door No.24, Kalyani Nagar, Kottivakkam, Chennai - 600 041
Residential Building
EC/NII/18531/2015
No.151, Ambedkar Nagar, Thiruvallur High Road, Attanthangal Village, Redhills, C...
Shops - cum - Kalyana Mandapam
EC/NI/13094/2016
New Door No.367, Old Door No.181 Mint Street, Sowcarpet, Chennai-3
Ground Floor + 2 Floors Commercial building
EC/N-I/11511/2016
Old Door No.184, New Door No.298, Thambu (chetty) Street, Muthialpet, George Tow...
Ground Floor + 2 Floors Commercial building
EC/NI/11931/2016
Old Door No.23, Mooker Nallamuthu Street, Chennai-1
GF+2F commercial building
EC/NI/11513/2016
New Door No.193, Old Door No.95, Thambu (Chetty) Street, George Town, Chennai-1
GF+FF+2F building
EC/NI/728/2015
Door No.40 , N.S.C.Bose Road , Chennai-79
GF + 2F commercial building
EC/NI/19265/2014
New No.167, Old No.82, NSC Bose Road, Sowcarpet, Chennai-79
Ground Floor + 2 floors + 3 floor (part) commercial building
EC/NI/10041/2015
New Door No.267, Old Door No.129, Lingi (chetty) Street, George Town, Chennai-1
Basement Floor + Ground Floor + 3 Floors + 4th Floor (part) ongoing Commercial cum Residential Building
EC/NI/1444/2011
Old Door No.7 & 8, New Door No.19 & 21, Astabujam Road, Choolai, Chennai-112
Multi Storied Building Stilt floor +4 Floors + 5th floor + 6th floor (pt) Residential building. (5th floor & 6th floor part are unauthorised construction )
EC/NII/10810/2015
Old.S.No.121/4, New S.No. 271/7, Door No.4/833, GNT Road, M.A.Nagar, Padiyanallu...
Hospital Building
EC/EA/N-I/5885/13
Old No.140, New No.374, Mint Street, Sowcarpet, Chennai-79, in R.S.No.6940, Bloc...
Construction at site is Ground Floor + Mezzanine Floor + 4 Floors + 5th Floor (part) Commercial cum Residential building consists of 61 shops and 6 dwelling units. The commercial portions in the GF and 2 floors consists of 61 shops were locked and sealed on 10.2.2016
ES2/12509/2013
Door No.13, 14 and 15, Sharmila Street, GST Road, Kamatchi Colony in S.No.215/2...
Ground Floor +1st floor + Mezzanine floor + 2nd floor + 3rd floor part, commercial building
Need Complete Property Verification?
Get ownership details, EC records, FMB, zone checks, geo-insights & AI analysis - all in one place
CMDA Locked & Sealed Buildings Guide
Understanding CMDA Building Sealing Actions
When buildings violate CMDA regulations and property owners fail to comply with enforcement notices, the Chennai Metropolitan Development Authority takes decisive action by physically locking and sealing the structures. This database maintains comprehensive records of all buildings that have been locked and sealed for various violations across Chennai Metropolitan Area.
Reasons for Building Sealing
- Unauthorized Construction: Buildings constructed without proper approvals or permits
- Plan Deviation: Structures deviating significantly from sanctioned building plans
- Non-compliance with Notices: Failure to respond to CMDA enforcement notices
- Safety Violations: Buildings posing risks to public safety
- Environmental Violations: Non-compliance with environmental clearances
- Court Orders: Judicial directives for sealing specific buildings
- FSI Violations: Exceeding permitted Floor Space Index limits
Legal Process for Sealing
CMDA follows a systematic legal process before sealing buildings:
- Violation Assessment: Detailed inspection and documentation of violations
- Notice Issuance: Show cause notice to property owners
- Response Period: Reasonable time for property owners to respond
- Final Warning: Last opportunity notice before enforcement
- Sealing Order: Official order authorizing physical sealing
- Execution: Physical sealing with police assistance if required
Types of Sealing Actions
CMDA employs different sealing methods based on violation severity:
- Complete Building Sealing: Entire structure sealed for major violations
- Partial Sealing: Only violating portions sealed
- Floor-wise Sealing: Specific floors sealed for unauthorized construction
- Temporary Sealing: Short-term sealing pending compliance
- Permanent Sealing: Long-term sealing for serious violations
- Commercial Sealing: Business activities prohibited until compliance
Impact of Building Sealing
Sealing of buildings has significant consequences for property owners:
- Occupancy Prohibition: No one can occupy or use the sealed premises
- Business Disruption: Commercial activities come to a complete halt
- Utility Disconnection: Water, electricity, and other utilities may be cut off
- Property Value Loss: Significant decline in property market value
- Legal Complications: Difficulty in property sale or transfer
- Rental Issues: Tenants may vacate, causing rental income loss
- Insurance Problems: Property insurance claims may be affected
Unsealing Process
Property owners can get their buildings unsealed by following proper procedures:
- Violation Rectification: Complete correction of all identified violations
- Compliance Certificate: Obtain engineer's certificate confirming compliance
- Penalty Payment: Pay applicable fines and compounding fees
- Documentation Submission: Submit all required certificates and approvals
- CMDA Inspection: Official verification of compliance by CMDA officers
- Unsealing Order: Official order for removal of sealing
Building Categories Commonly Sealed
Different types of buildings face sealing for specific violations:
- Residential Buildings: Setback, height, and FSI violations
- Commercial Complexes: Parking, fire safety, and land use violations
- High-Rise Buildings: Structural safety and fire safety violations
- Industrial Buildings: Environmental and safety compliance issues
- Educational Institutions: Safety and infrastructure violations
- Hospitals: Fire safety and accessibility violations
- Hotels: Fire safety and structural violations
Prevention and Compliance
Property owners can avoid sealing by ensuring compliance:
- Regular Self-Audit: Periodic compliance checks of property
- Professional Consultation: Engage qualified architects and engineers
- Timely Response: Prompt response to CMDA notices and communications
- Documentation Maintenance: Keep all approvals and certificates updated
- Voluntary Disclosure: Proactively report and rectify violations
- Legal Advice: Consult legal experts for complex violation issues
Database Information
This database provides comprehensive information about sealed buildings:
- Property Details: Building address, owner information, and file numbers
- Sealing Date: When the enforcement action was taken
- Violation Type: Specific violations that led to sealing
- Current Status: Whether the building remains sealed or has been unsealed
- Action History: Timeline of enforcement actions taken
- Building Category: Type and classification of the sealed building
Disclaimer
The sealed building records presented here are compiled from official CMDA enforcement actions for public awareness. Building status may change based on compliance, appeals, or court orders. This database is provided for informational purposes only and should not replace official verification with CMDA authorities. Property transactions should include proper due diligence on sealing status. Always consult with CMDA officials and legal professionals for specific building-related legal matters.